Atfeeh Water Station and Networks (1st Phase) - Egypt

Water & Wastewater   ::  Completed Projects   ::  2023  ::  


Starting Date: 14/5/2003
Expected Delivery Date: 30/9/2023
Owner: The Construction Authority for Potable Water and Wastewater (CAPW).
The Main Contractor: The Arab Contractors (Osman Ahmed Osman & CO.) -Helwan Branch.
Owner Consultant: Misr Consult Environment and Infrastructure Studies (Dr. Sameh Abdel Gawad).
Company Consultant: Khalifa Consulting Engineers – Dr. Abdel Kawi Khalifa (KCE).

Project Description:
Civil and electromechanical works for the filtered water station with a capacity of 700 to 1400 l/s as a future expansion and force mains to feed Atfeeh and its neighboring villages with water, it includes:
- Intake: 3 pipes with a diameter of 900 mm, with a total length of 3 x 285 m = 855 m. It also includes the implementation of a steel bridge extending 60 meters, carried on piles with a diameter of 300 mm inside the Nile, with a total weight of 150 tons. The entry of water is controlled by 3 valves in addition to the filters.
- Purification station: The total capacity of the station is 1400 litres/second
- Hydraulic Structures: (ground tank - purifiers - distribution shaft building - filters - Sludge lagoons Building - turbid and filtered water pumps building - chemical building).
- Typical buildings: (the mosque - the administrative building - the warehouse and workshop - Chlorine building - transformer building - generation building - security and information building – fence).
- networks 46.8 km with different diameters starting from 800 mm to 1200 mm diameter prestressed concrete - 300 to 700 mm GRP pipes - 200 to 250 mm UPVC pipes.

- Additional work: 3 upper tanks with a capacity of 500 m3 to 2500 m3.
- Networks with a length of 17.4 km to feed the school complex in Atfeeh, Manshaat Soliman, Al Qababat AlBahariya and Ezbet El Masry.

- Sludge improvement system.