Al Raziqat Qibli Subsidiary Wastewater Pumping Station - Luxor - Egypt
Water & Wastewater
:: Completed Projects
:: 2025 ::
The station was implemented by the Arab Contractors Company on an area of 500m2, serving approximately 7,000 residents of the village, at a total cost of EGP 30 million.
The project includes a manhole with a diameter 4m, 2 pumps (1 operating and 1 standby) with a capacity of 50 l/sec. at a head of 14m, an operation chamber, a diesel generator with a capacity of 70 kVA, a security building, a storage building, a fuel tank, in addition to pump hoists, screens, measuring and control devices, and external lighting.