• Home / /
  • Projects / /
  • Expansion of New Nubaria Treatment Plant

Expansion of New Nubaria Treatment Plant - Egypt

Water & Wastewater   ::  Completed Projects   ::  2023  ::  

 
Capacity: 22,000 liters/second
Initial handover date: 07/03/2023 (partial)
Executing Company: The Arab Contractors (Osman Ahmed Osman and Co.)
Type of contract: Order No. 6-908/2010
Project Components:
First: Treatment Station:
- Inlet, refineries, separation of sand, oil, and grease - air blowers.
- 2 Equalization basins – equalization pit - 2 aeration and phosphorus removal basins.
- 4 final sedimentation basins - chlorine mixing basin - chlorine injection building.
- 2 sludge concentration basins - concentrated sludge lifting station - returned and excess sludge lifting station - treated water lifting station - generator building - transformer building.
- Main panels building - 27 drying basins - purified water pit.
- Flow meters’ chamber - intermolecular lines between units - internal drainage and supply network.
- Administrative building (laboratory and control room) - curbstones and sidewalks work.
- The warehouse and workshop building - the medium-voltage building.
- The security room - the fence - electromechanical equipment.
Second: Final Wastewater Treated Channel:
- 710 mm diameter pipes with a length of 10,000 m.
- Valve chambers – 2 tunnel crossings.

Water & Wastewater