Arab Contractors

  • Projects
  • Sectors
  • Home
  • About Us
    • Company Profile
    • History
    • Vision & Mission
    • Policies
    • Board of Directors
    • Human Resources
    • Machinary & Equipment
    • Five Years Records
    • Rankings and Recognition
  • News & Media
    • News
    • Videos
  • Sectors
  • Projects
  • Sustainability
  • Arab Contractors in Africa
  • Arab Contractors in Asia
  • Services
    • Monuments Restoration
    • Marine Constructions
    • Shipyards (Massara Shipyard)
    • Bridges and Specialized Structures
    • Foundation
    • Formworks & Specialized Works
    • Tunnels & Slip Forms
      • Pipe Jacking
      • Slip Forms
    • Ready Mixed Concrete
    • Manufacturing
    • Equipment Hiring
      • Equipment Hiring
      • Sheet Piles
    • Laboratories
    • Engineering Consultancy
    • Networking & Information Systems
  • Workers Welfare
  • Locations
    • Egypt
    • Africa
    • Asia

Projects

  • Home / /
  • Projects / /
  • The Old Cairo International Airport

The Old Cairo International Airport - Egypt

Airports   ::  Completed Projects   ::  2000  ::  

it accommodates 5 million passengers annually , it includes arrival , departure and VIP terminals, 7 movable telescopic gateways as direct outlets serving 9 aircrafts simultaneously , free shops and airlines offices , as well as all the necessary utilities and services. The project completed in 1986. Works were carried out by a consortium of The Arab Contractorswith CGEE ALSTHOM Group & CFEM (France).

Joint Ventures

Card image cap
Greater Cairo Metro Line 3 - Phase 3C
Card image cap
Greater Cairo Metro Line 3 - Phase 3B
Card image cap
New Delta Water Treatment Plant
Card image cap
Alexandria East Wastewater Treatment Plant
Card image cap
Adly Mansour Interchange Station
Card image cap
Greater Cairo Metro Line 3 - Phase 3A
Card image cap
Light Rail Transit - LRT (Adly Mansour – New Administrative Capital – ...
Card image cap
Bahr El Baqar Water Treatment Plant
Card image cap
Cairo Metro Line 3 - Phase 4B
Card image cap
Cairo Metro Line 3 – Phase 4A (Haroun- El Shams Club)
Card image cap
Cairo Metro Line 3 – Phase 2 (Abassiya / Al-Ahram)
Card image cap
Sheikh Zayed Water Treatment Plant
Card image cap
Cairo Metro Line 3 - Phase 1 (Attaba - Abbassia)
Card image cap
Mubarak Peace Bridge - Al Qantara
Card image cap
Oyoun Moussa Thermal Power Station
Card image cap
Al Azhar Tunnel - Cairo
Card image cap
Bibliotheca Alexandrina
Card image cap
Greater Cairo Wastewater Projects
Card image cap
Cairo Metro Line 2
Card image cap
Greater Cairo Metro - Line 1
Card image cap
Dammietta Port
Card image cap
Martyr Ahmed Hamdy Tunnel

The Arab Contractors (Osman Ahmed Osman & Co.)

It is one of the leading construction companies in the Middle East and Africa

  • News
  • Workers Welfare
  • Legal
  • Locations
  • Home
  • About Us
  • Projects
  • Services

Contact Us

info@arabcont.com

+2 02 23959500

34 Adly Street - Cairo

Follow Us

Copyright © 2025 | The Arab Contractors. All rights reserved.

Designed by Top Management Information Center