Julius Nyerere Hydropower Plant and Dam - Tanzania
                    
                    
                        Power Stations
                          ::  Ongoing Projects
                          ::  Starting Date : 2021  ::  
                    
                    
                    
                    
                        
                            Employer: Tanzanian Ministry of Energy 
   Contractors: JV Arab Contractors Company and Elsewedy Electric 
   Project location: Stigler's Gorge Area, the dam is located in the Morogoro area on Rufiji River - Tanzania
    Completion Period: 42 months including 6 months mobilization
    Project Objectives:
   Generating electricity with capacity of 2115MW to satisfy energy needs in Tanzania Control water flow in the period of flooding and thus providing the necessary water requirement
  Main items: 
   -Total excavation is about 4 million m3 
   -Total aggregate backfilling is about 7.5 million m3 
   -Total volume of concrete is about 2.6 million m3
    -Total weight of reinforced steel is about 64000 ton
Scope of Work: 
 -Main dam for storage of water to generate hydropower using RCC concrete for main dam with total length 1025m at crest level and 130m dam level
    -Construction of 4 saddle dams for reservoir impounding of water with a capacity to impound approximately 33 billion m3 of water 
   -Construction of a hydropower plant with a capacity of 2115mw and a substation of 400kv; in addition to 400kv transmission lines to the nearest point of the public network  The civil works includes the following:
    -Permanent access roads connecting the site with the existing roads network and length about 21km
    -Temporary access roads that connect all permanent facilities with length of 59km
    -Main dam of RCC on Rufiji River Power plant with administration building, control building, workshops and stores
   -Connecting power station 400kv including transmission lines 4 variable height and length dams for water impounding of reservoir Diversion tunnel 660m length (15*17m) and 2 cofferdams 
   -The main spillway is located on the center of the main dam with 7 radial gates and an emergency spillway is located in the first saddle  -Permanent concrete bridge on Rufiji River 
   -Integrated residential complex on an area of 19000m including housing and playground, permanent furnished offices; in addition to temporary residential complex, utilities, lighting, drinking water and water treatment
Main electromechanical works for power house: 
   -Power plant 2115  -9 vertical Francis turbines, each turbine capacity is 235mw 
   -9 butterfly valves for entrance 
   -9 vertical axis generators
    -Water and sewage cooling systems 
   -Ventilation, air-conditioning, firefighting and communication systems
    -Protection, control and monitoring equipment 
   -3 diesel generators for the power plant, dam and spillway 
   -Other supplementary items