• Home / /
  • Projects / /
  • Pipelines connecting eastern El Medina El Monouara tanks and El Ashira Tank

Pipelines connecting eastern El Medina El Monouara tanks and El Ashira Tank - Saudi Arabia

Water & Wastewater   ::  Completed Projects   ::  2018  ::  

The project works consist of
supply and installation of pipes diameter 1000 mm length = 11900 m.l,
supply and installation of pipes diameter 800 m.l length = 15720 m.l,
supply and installation of pipes diameter of 600 mm length = 18 m.l and is located between the east of Medina city Tanks and El Ashira tanks in addition to cut & cover excavation works length: 27,638 m.l
Value: 14,400,000 US$
Completion Date: 2018