Tunnel of Prince Majed Street Intersection with Rawdah Street - Saudi Arabia

Tunnels   ::  Completed Projects   ::  2011  ::  

Construction of a car tunnel with a total length of 710 m and a width of 29m; the length of the covered part is 205 m. The tunnel has two lanes, each 13.5m wide, an intermediate platform 2m wide, a diaphragm wall 60cm thick and 55m long, and secant piles 655m long. The electromechanical work consists of 3 pumping rooms, including 9 deep pumps, a lighting and ventilation system, distributing panels, fans, and a piping system. In addition to pavement and landscaping works.
The tunnel width is 26 m divided into three lanes.
Value : 95 million SR