Hassab Allah El Kafrawy Axis Extension Bridge on Maadi Corniche - Egypt
                    
                    
                        Bridges & Flyovers
                          ::  Ongoing Projects
                          ::  Starting Date : 2024  ::  
                    
                    
                    
                    
                        
                            Hassab Allah El Kafrawy Axis Extension Bridge on Maadi Corniche is being implemented by the Arab Contractors  Company with a length of about 1208 meters to connect Cairo to Giza, and to shorten access to the Misr-Assiut Agricultural Road.
   The new bridge is being implemented by the Arab Contractors  Company under the supervision of the Armed Forces Engineering Authority - Department of Military Engineers.
   - Its total length, including the entries and exits 1564 meters.
   - It consists of an eastern side with a length of 74 meters and a width from 32 to 52 meters.
   - A bridge over the Nile with a length of 400 meters and a width of 52 meters and the top of the island is 216 meters long and 52 meters wide.
  - A western side 458 meters long and 46 to 52 meters wide.
   - It includes three navigation slots, the largest of which is 130 meters long.
   - In addition to a steel span 58 meters long and 52 meters wide
 - Two ramps: an entry 172 meters long, and an exit 184 meters long and 11 meters wide.