El Saff Wastewater Treatment Plant - Egypt

Water & Wastewater   ::  Ongoing Projects   ::  2023  ::  

Starting date: 01/04/2006.

Owner: The Construction Authority for Potable Water and Wastewater (CAPW).
The main contractor: The Arab Contractors (Osman Ahmed Osman & CO.) -Helwan Branch.
Owner Consultant: Misr Consult (Dr. Sameh Abdel Gawad).
Company Consultant: Future Consult.


Project Description:
- El Saff wastewater treatment plant includes a treatment plant with a discharge rate of 1900 m3 / day for the first phase until 2025, and a discharge rate of2700 m3 / day from 2025 until 2040 in addition to lifting stations and force mains 9 km in length, 800 mm in diameter, 1.5 km in diameter, 600 mm in length,1.3 km in diameter, and 400 mm in length, and gravity sewers.


- Lifting Stations: It consists of 4 stations and includes:
(a lifting substation + a main lifting station + an auxiliary lifting station "booster" on the force main + the purified water pumping station)
Gravity Sewers: sewage pipes with a length of 113 km, glazed clay pottery pipeswith different diameters from 175 to 600 mm, of which 4.2 km are reinforced concrete pipes with diameters from 700 to 1200 mm) + force mains of GRP and cast iron pipes.


- Crossings: El Kurimat Road crossings (pipe jacking, open cut trench)
crossing beneath Kom Ombo Lake using pipe jacking.
All work has been completed, and the primary delivery procedures are underway.