Al Takhasosi Bridge - Riyadh - Saudi Arabia

Bridges & Flyovers   ::  Completed Projects   ::  2016  ::  

The bridge in the intersection of Prince Saoud ibn Abdel Aziz with Al-Takhasosi Street in Riyadh with a total cost 68 million SR.
The new bridge aimed to release the corridors and the main intersections to facilitate traffics and reduce the transportation time inside Riyadh.
The project executed within 24 months only, it is consisting of two-ways bridges (700m length for each way). The bridge total length is 435m in addition to 265m for inlets and outlets; 25.5m width and has 3 lanes. The project includes the civil works related to the foundation (piles – reinforced concrete bases – pillars – beams – slabs) and the utilities – lighting – greenery – flood drainage – work site coordination.