Edco Port - Egypt

Ports & Marinal Works   ::  Completed Projects   ::  2012  ::  

 

Owner:The Egyptian Navy.
The supervising authority: Public Service Center at the Faculty of Engineering- Alexandria University.
Contract value: LE 184.085000.
Completion date: April 30, 2012.

 

Constructionworks:

-Administrativebuildings (the port command building with a surface area of 600 m2) (2 floors).
-Port wall (length 1000 m).
-Guard towers (6 towers). 
-Security buildings (2 buildings with an area of 18 m2).
-Road work (with an area of 26000 m2).
-Water and electricity networks.
-2 temporary administrative buildings for supervision staff with areas of 200m2 and 100 m2 (loaded)
Additional works:
-Upper tank 50 m3.
-Ground tank 50 m3.
-Transformer chamber (3 chambers).
-Distributor chamber.
-Service channel at the dock.
-An extension of the permanent wall with a length of 200 m.
-2 additional guard towers.
-Meteorology and guidance room at the top of the command building.