Soil Investigation, Water Wells and De-watering Systems

Since the year 1972 the division of wells drilling and dewatering had started by a great qualified engineers and trained workers in the area of drilling production water wells and works of dewatering in all over Arab Republic of Egypt in the great projects and that depends on high technology in this area. This division is specialized in water wells to obtain underground water for all purposes to depths of 300 meters.

The previous division has complete equipment for well-point or deep-well systems to cope with all the construction works of water or sewage piping, lines of rising or gravity types or any other construction that would be executed without underground water the previous division has also hydraulic drilling machine that can handle casing up to 12 inch diameter and down to 300 meters depth in all kinds of soil there are almost two hundred submersible pumps, fully equipped for controlled operation up to 30 H.P capacities for discharges up to 250 cubic meters per hour to complement this scope of specialized work are accompanied by a number of pipes and filters of diameters ranging from 4 to 16 inch plenty of pizometers and pumps up to 60 HP for testing well discharge and pressure on the other hand if extra power is required then portable generators could be made available giving up to 300 K.V.A the ancillary equipments are varied including cranes, tractors trailers, compressors, water tanks, haulage wagons and similar items.

Eqipments

Projects

  • Dewatering of the Al-Abasa water station by using well point system.
  • Dewatering by using deep well system in El-Gabal El-Asfar project-Tender 16/2.
  • Dewatering by using deep well system for sewage Networks in Cairo, Beni Suef, Alex, Tanta, Aswan and Luxer.
  • Dewatering of the Gulf Suez Pump station by using well point system.
  • Construction of 70 deep wells up to 250 m in Salheya project.
  • Construction of 22 deep wells up to 500 m in North sinaa.
  • Construction of Baraka wells “Pure water well”.
  • Construction of pepsi cola factory well.
  • Construction of Baraka wells (pure water well).
  • Dewatering of the Ayon Mosa Electrical Station be using deep wells system.
  • Construction of Pepsi cola factory well.
  • Construction of 70 deep wells up to 250 m in Salheya project.
  • Dewatering of the Gulf Suez pump station by using well point system.
  • Dewatering of the Al-Abasa water station by using well point system and deep well system.
  • Dewatering by using deep well system in El- Gabal El-Asfar project-tender16/1.
  • Dewatering by using deep well system for sewage networks

Contact Information

Marine Structures Dept.

  • Kilo 52 Egypt Ismailia Desert Road - Sharkia Governorate
  • 0554410473
  • 0554410470 - 01206980723
  • Dept. Manager : Eng. Osama AbdElhamid
  • dredge@arabcont.com