30th July Axis - Egypt

Roads   ::  Completed Projects   ::  2019  ::  

It is a dual freeway 95 km length and 80m width. It started from South Port Said passing by the International Coastal Road Port Said/Damietta; it extends to the South till kilo 94 Cairo/Ismailia desert road. The axis has two directions, each one of them has 5 traffic lanes (2 lanes for the heavy transport and 3 lanes for the vehicles). The new axis has 11 main bridges and 6 sub-bridges, 16 tunnels, toll station for trucks and cars.
The Arab Contractors Company carried out the dredging works, soil replacement and crossovers with a width up to 80m inside El Manzala Lake; constructing 3 foundation layers, each layer is 45cm thickness and width varied from 55m to 77m. In addition to bonding layer with 7cm thickness and surface layer 6 cm thicknesses.

The total cost of the project is 300 million EGP.