• Home / /
  • Projects / /
  • Wilayat Al Amerat Wastewater networks - Contract A2

Wilayat Al Amerat Wastewater networks - Contract A2 - Oman

Water & Wastewater   ::  Completed Projects   ::  2019  ::  

Wilayat Al Amerat Wastewater networks Project - Contract A2 Sultanate of Oman
Brief Description: The project includes the installation of sewerage network for the Western Amrat , it consists of Gravity networks of HDPE with length 18.5 km and diameters ranging from 300 mm to 900 mm and main sewerage pipelines and force main pipeline of HDPE with length 7.11 km and diameters ranging from 125 mm to 315 mm and House connections of UPVC with total length of 190.36 km and diameters of 160 mm, 200 mm, 250 mm. and also project includes 2782 inspection rooms in addition to fibre optic networks, with a total length of 337.93 km with the installation of all accessories necessary for network.
Value: 84,971,000 US$
Completion Date: 2019