September 2, 2007

Inauguration of Dekhila Port Development Works and Modernisation of New Nubaria Lock

On 2nd of September, 2007 Dr. Ahmed Nazif- the Prime Minister, Dr. Osman Mohammed Osman – State Minister of Economic Development, Eng. Mohammed Mansour-Mister of Transportation, Eng. Rashid Mohammed Rashid- Minister of Trade and Industry, Gen. Abdel Salam Mahgoub- State Minister of Local Development, Gen. Adel Labib- Alexandria Governor, Eng. Ibrahim Mahlab- President of the Arab Contractors Co., Gen. Ibrahim Youssef- Chairman of Alexandria Port Authority and Gen. Eng. Kareem Abul Kher during the inauguration of ships controlling tower of Alexandria Port, inspection of the development of Dekhila Port, signing of the agreement of New Nubaria Lock construction and modernization, with a total value 321 EGP million and modernization of “El Maleh” Lock with a total value 90 EGP million, as part of the development of Cairo-Alexandria riveree roadway and Nubaria lake (220KM). The Board Members of the Arab Contractors Co. Eng. Nouh Meshref, Eng. Osama Shawki and Eng. Mohammed Tawfic attended this event.

Card image cap
Ports & Marinal Works