With the growth of the bridges and construction projects we have developed a pouring system for their concrete component using metal moulds for obtaining the bridges components using precast system.

  • Product fair surface.
  • High pouring rates.
  • No use of metal scaffolds.
  • Clean work sites due to pouring the concrete in yards.

The Technical Office:

The technical office is responsible for the detailed shop drawings according to the design created by the Engineering Unit.

Manufacturing Unit :

  • 4 drilling machines.
  • A band saw.
  • 4 cutting wheel disks.
  • Group of welding m/c.
  • 2 overhead cranes (10 tons).

Contact Information

Formworks & Specialized Works Dept.

  • Kilo 47, Cairo/Ismailia Desert Road
  • 01273040066 - 01225511948 - 0128302360
  • 01229097862 - 01206980432
  • Dept. Manager : Eng. Sherif Fikri Abdel Halim
  • ac_csd@arabcont.com