|
|
Reforming and supplying
steel reinforcement according to the following specifications:
- Diameters up to 50 mm.
- Lengths up to 24 m.
- All grades of steel reinforcement.
- Straitening steel reinforcement coils up to 12 mm for all grades.
-
Making the mechanical connections (i.e. couplers).
Capacity :
-
The production capacity reaches 8000 tons/month.
Advantages :
- Minimizing the scrap percent of the steel re-bars.
- Achieving high quality works
according to the international quality system (ISO 9001-2000).
- Increasing the productivity to execute the projects
program on time.
- Using Recent Technologies &
machinery (minimizing the manpower)
- Overcoming
the limited workshop area.
The steelyard including two workshops.
The first workshop includes:
- 1st production line
- Straitening and cutting machine
diameters ranged between 6 mm to 12 mm followed by three bending machines.
- 2nd production line
- A trolley cutting machine moves
in distance 36m and followed by two bending machines diameters ranged between 16
mm to 32 mm and conveyers.
- 3rd production line
- A trolley cutting machine moves in distance
36m and followed by two bending machines for diameters ranged between 16 mm to 32
mm and conveyers.
- 4th production line
- Straitening and cutting machine for diameters
ranged between 6 mm to 12 mm followed by three bending machines.
- 5th production line
- 2 straitening and cutting machine for diameters
ranged between 6 mm to 10 mm
- In addition to other cutting machines and
4 mobile cranes.
The second workshop comprises:
- 1st production line
- A cutting machine followed by
bending machine for diameter from 16 mm to 40 mm.
- 2nd production line
- A trolley cutting machine followed
by four bending machine for diameters from 8 mm to 32 mm.
- Three mobile cranes for loading
and unloading.
- 3rd production line
- Automatic stirrups with diameters
ranged between 6 mm to 12 mm.
- In addition to three mobile cranes.
|
|
|
|
|
|
|
|
|
|
Related Information
|
|
|
|
|
|
Latest News
|
|
A year after 25th January revolution, thousands of Egyptians and AC workers in Nigeria contributes in the revolution anniversary. They stand minute of silence to greet the revolution martyrs and pray....
Read more
|
|
Wael Bou Faour, the Lebanese Minister of Social Affairs and Egyptian Ambassador Mohamed Tawfic in Lebanon signed the contract of West Bekaa Water Project with a total value 36 million US$. The projec....
Read more
|
|
After the first visit of Field Marshal Mohamed Hussein Tantawi to Libya after the revolution; Eng. Mahlab and the Chairman of Libya Economic and Social Development Fund established The Arab Contracto....
Read more
|
|
Eng. Ibrahim Mahlab, President and CEO of The Arab Contractors Co. met with the Islamic preacher Dr. Amr Khaled, the founder of "Life Makers" Association and Eng. Mohammed Hanna, Chief Technical....
Read more
|
|
|
|
|
|
|