    Piles  |  Diaphragm Wall & Barrette   Injection & Micropile






Bibliotheca Alexandrina
_________________________________

Bibliotheca Alexandrina is a striking piece of hi-tech architecture billed as the revival of the ancient library of Alexandria. The project was contructed in two phases:
The first phase: Joint Ventrue Arab Contractors/RODIO/ TRA VI of Italy for deep foundation & Diaphragm wall.





Mubarak Peace Bridge across Suez Canal - East bank.
_________________________________

The bridge is Considered one of the most important arteries that are connecting sinai in Asia with rest of mother land of  Egypt in Africa, crossing over Suez Canal. The Arab contractors scope of work was the eastern part, which includes the approach bridge on deep foundation.






6 th Of October Elevated Road
_________________________________

It is the longest elevated road in Egypt, 11.273km long and 18-34 m wide.. It has 38 inlet and outlet ramps with a width of 8m and 9.920 km long All construction phases did not hinder the Nile navigation in both of its branches. The latest techniques were utilized in construction. Some of these techniques were used for the first time in Egypt. Bored Piles of 60-150Cm dia. and depth up to 30m was used to support the foundation of the bridge.





El- Moneeb Bridge
_________________________________

It is considered the largest bridge. crossing the Nile in length & wideness of navigation spans. It connects Cairo easterly and Giza westerly. It is one of the most important axis of the ring road around Greater Cairo. This bridge connects Alexandria desert road, Fayoum, 6th of October City, east and west bank of the Nile, south Giza and upper Egypt. The bridge has 6 inlet and 6 outlet ramps. The length of the bridge is 2km its width is 42m.





15 th Of May Bridge
_________________________________

First and second stages :are starting at Sphinx square and crossing the two branches of the River Nile at Zamalek and Abou EI-Ela, it ends at Boulak. It is 4.5km long, including 15 inlet and outlet ramps.





Stanly Bay Bridge Alexandria
_________________________________

In Egypt it is the first bridge to be constructed into the sea, with a total length of 400 m, consisting of 6 spans .It constitutes a major part of the reconstruction and decoration of Alexandria corniche. A master piece of architecture precision, the bridge preserves the architectural style of Egypt. The scope of work includes: Offshore deep foundation (Bored Piles) to support Stanly bridge, 102 piles 100cm dia. 28m depth & 98 piles 150cm dia. 35m depth.





26 th Of July Axis
_________________________________

26th of July axis begins at Cairo - Alexandria desert road in front of the entrance of 6th of October City. Penetrating Greater Cairo region reaching 6th of October elevated road at Cairo down town.





South Dahshour Bridge
_________________________________

The project represents the most important portion of the regional ring road around Greater Cairo, starting from EI-Fayoum desert road, linking the new communities and crossing the River Nile at EI-Beleda zone. The scope of work includes: 1500 piles 80cm dia.& 22.0m average depth.