|
|
Monuments restoration is a very special operation needs a lot of care, distinct
expertise, special historical repair materials, and special equipment. It also needs
a detailed study to the monuments to register and document its condition, and all
the defects affecting the building stability, all crakes and study to its movements
and deterioration, and all new unhistorical additions. The study phase is a very
time consuming since it include follow up and watching up to the building defects
characteristics. This phase ends up with a full restoration design for the building.
Our previous restoration projects helped us to build up valuable extensive experience,
know-how and capacity in the fields of: monuments registration, documentation, and
restoration designs, foundations consolidation, wall stitching, injection, and waterproofing,
and fine works of wood, marble and paintings conservation and restoration.
The Arab Contractors Restoration Capacity includes equipments and expertise of :
1) Study, registration, and documentation:
- Photogremetry.
- Laser Scanning.
- Steel Detector.
- Radar Scanning.
- Underwater Dictation & Documentation.
2) Foundation Consolidation:
3) Stone walls restoration:
- Stitching.
-
Injection.
- Waterproofing.
4) Fine Works of Wood, Marble, and Painting
Conservation and Restoration:
- Clean
Up (Mechanical, Chemical, and Manual).
- Sterilization.
-
Reinforcement.
-
Re-touch.
-
Insulation.
Samples of our projects
|
|
Sultan Ghouri
Mosque
|
Al Astdar Mosque
|
|
|
Aziza Fahmy
Palace
|
The Ancient
Religious District
|
|