 |
 |
|
|
Engineering Consultancy and Technical Services
|
Designs
|
Development of the Executing Methods
|
Supervision and Surveying
|
|
|
Development of the Executing Methods
It is aiming at providing the high quality studies and execution at the
lower cost and ensuring safety as well. These objectives accomplished through 5
main factors:
- Development of the execution methods:
It is including the site preparation, providing the execution phases, designing
the appropriate methods for the execution, preparation and designing of the
temporary structures and its installation phases, providing the required designs
to ensure safety and shop drawings.
- Monuments Restoration:
It is preparing the required studies of the monuments restoration using the
state of the art technologies.
|

The relocation of King Ramses II statue
|

Restoration of Sultan Al-Ghouri Mosque
|

Restoration of the Hanging Church
|
|
|
|
- Geotechnical Engineering and Deep
Foundation:
It is studying the soil geotechnical specifications to solve the buildings
problems. Besides; it is preparing the different designs for the deep
foundation.
- Buildings Rehabilitation:
It is providing the required execution methods and shop drawings for the
buildings' rehabilitation (monuments and modern buildings), putting into
consideration the safety and insurance of the building.
- Buildings controlling systems:
The buildings is affected by the new buildings, excavation works, drainage,
dynamic loads, soils changed mechanics, and other factors that require
preparation and designing of controlling systems for these buildings through the
following mechanisms:
- Preparing and designing of controlling methods.
- Executing the controlling works using the suitable apparatus
- Preparing the required observing and analytical tables
- Risks evaluation and data analysis
|
|
|
|
|