|
|
Reforming and supplying
steel reinforcement according to the following specifications:
- Diameters up to 50 mm.
- Lengths up to 24 m.
- All grades of steel reinforcement.
- Straitening steel reinforcement coils up to 12 mm for all grades.
-
Making the mechanical connections (i.e. couplers).
Capacity :
-
The production capacity reaches 8000 tons/month.
Advantages :
- Minimizing the scrap percent of the steel re-bars.
- Achieving high quality works
according to the international quality system (ISO 9001-2000).
- Increasing the productivity to execute the projects
program on time.
- Using Recent Technologies &
machinery (minimizing the manpower)
- Overcoming
the limited workshop area.
The steelyard including two workshops.
The first workshop includes:
- 1st production line
- Straitening and cutting machine
diameters ranged between 6 mm to 12 mm followed by three bending machines.
- 2nd production line
- A trolley cutting machine moves
in distance 36m and followed by two bending machines diameters ranged between 16
mm to 32 mm and conveyers.
- 3rd production line
- A trolley cutting machine moves in distance
36m and followed by two bending machines for diameters ranged between 16 mm to 32
mm and conveyers.
- 4th production line
- Straitening and cutting machine for diameters
ranged between 6 mm to 12 mm followed by three bending machines.
- 5th production line
- 2 straitening and cutting machine for diameters
ranged between 6 mm to 10 mm
- In addition to other cutting machines and
4 mobile cranes.
The second workshop comprises:
- 1st production line
- A cutting machine followed by
bending machine for diameter from 16 mm to 40 mm.
- 2nd production line
- A trolley cutting machine followed
by four bending machine for diameters from 8 mm to 32 mm.
- Three mobile cranes for loading
and unloading.
- 3rd production line
- Automatic stirrups with diameters
ranged between 6 mm to 12 mm.
- In addition to three mobile cranes.
|
|
|
|
|
|
|
|
|
|
Related Information
|
|
Contact Information
|
Scaffolds & Specialized Works Dept.
Kilo 47, Cairo/Ismailia Desert Rd.
Tel.:
002 015 410 425
Fax:
002 015 41 0
Dept. Manager : Eng. Mohammed Mahmoud Mohammed Taha
Head of Sector : Eng. Emam Afefy
|
|
|
Quick Links
|
|
Our Policies
|
|
History /Timeline
|
|
Worldwide Office Locations
|
|
|
|
|
Latest News
|
|
The Minister of Transport and Alexandria Governor inaugurated the development works of Sidi Gaber Station in Alexandria. It was executed by the Arab Contractors Company with a total value EGP 225 mil....
Read more
|
|
Within the framework of strengthen the cooperation with South Sudan in the different fields; the Minister of Water Resources and Irrigation, Dr. Mohamed Baha'a El Din attended the signing of 3 contra....
Read more
|
|
Dr. Eng. Ossama El Hosseiny - Chairman of the Arab Contractors met with Mr. Sekimngo Wa Magango - Head of the National Authority for Social Insurance in Congo and his accompanied delegation.
Th....
Read more
|
AC has been awarded 5 new contracts in Nigeria with a total value 65 million US$.
The projects are the construction of Ampas – Umuahia road, the reconstruction of alolo and Yaya Abatan R....
Read more
|
|
|
|
|
|
|