AC Logo
 
AC Worldwide
AC Worldwide
 
   
Construction Services
  Services
Skip Navigation LinksHome : Services : Ready Mixed Concrete
Ready Mixed Concrete
 

1. Light Weight Concrete (LWC)
Its density varied from 1000 to 2000 kg/m³ using light-weight aggregate to produce concrete according to the required density and criteria.

2. Heavy Weight Concrete
Its density varied from 2500 to 4000 kg/m³ using heavy-weight aggregate to produce concrete according to the required density and criteria.

3. Normal Weight Concrete
By using Normal Portland Cement or Sulfate Resistant Portland Cement, admixtures & silica fumes with different operating methods varied according to the pouring type. The cube compressive strength ranged between 100 kg/cm² to 4000 kg/cm² after 28 days.

4. Highly Performance Concrete
By using Normal Portland Cement or Sulfate Resistant Portland Cement, admixtures & silica fumes. The cube compressive strength reaches 800 kg/cm² after 28 days.

5. Special concrete
Using admixtures, polyethylene, polypropylene increased resistance to cracks, tension and enhance concrete durability.

6. Early Age Crack Resistance Concrete
The cube compressive strength reaches 200 kg/cm² after 24 hours by using special admixtures. By using highly operating method in pouring the concrete the cube compressive strength reaches 200 kg/cm² after an hour.
Related Information
Contact Information
Ready Mixed Concrete Dept.
28 Mohammed Fahmy El Mohdar - Nasr City - Cairo
Tel.: 020222634319
Fax: 020224018648
Dept. Manager :Eng. Mohammed Bahi El Din Mohamed
E-mail:acconc@arabcont.com
Quick Links
Latest News
October 16, 2018 |Within His Tour in Dakahlia; The Prime Minister Inspecting the Touristic Walkway in New Mansoura City
Within his tour to follow up the development projects in Dakahlia, Prime Minister – Dr. Moustafa Madbouli visited the touristic walkway in New Mansoura City. He praised the ongoing works in the walkw.... Read more
October 16, 2018 |Minister of Antiquities and Kazakhstan Ambassador to Cairo Praised the AC during their Inspecting Visit to Al-Zaher Baybars Mosque to Resume its Restoration Works
October 15, 2018 |Gen. Kamel El Wazir in Inspection Tour for Port Said Tunnels under Suez Canal
October 9, 2018 |Managing Director of the Military Engineers Department Inspecting Middle Ring Road in Helwan Intersections and Rod El Farg Axis
Read All News