AC Logo
 
AC Worldwide
AC Worldwide
 
   
Construction Services
  Services
Skip Navigation LinksHome : Services : Portable Cabins
Portable Cabins

The Arab Contractors Company is manufacturing the portable cabins for the projects and work sites' equipping

Technical Specifications:

  • Varied dimensions according to use.
  • Main Frame: 3 mm cold-formed steel sections.
  • Outer Walls: 40 mm polyyortan sandwich panels (moisture isolator) and the facade 5.0 mm pre-coated galvanized steel sheets.
  • Inner walls with the same specifications of the outer walls in addition to decorative wood covered with PVC or artificial crust.
  • Flooring: 20 mm plywood floor covered with vinyl or high-density MDF.
  • Roof: the upper layer made from 0.5 mm corrugated galvanized iron sheet with a slope shape to ease storm-water drainage and the bottom layer made from 60 cm * 60 cm Armstrong tiles.
  • Doors and Windows: black or silver anodized aluminum sections for the external doors.
  • Electrical Works: executing all the required electrical connections to install the required spotlights.
  • Plumbing Works: executing all the internal connections and using sets made by the best Egyptian companies in the sanitary works.
 

Related Information
Contact Information
Scaffolds & Specialized Works Dept.
Kilo 47, Cairo/Ismai
Tel.: 01273040066 - 01225511948 - 0128302360
Fax: 01229097862 - 01206980432
Dept. Manager : Eng. Abu Bakr Ahmed Kamel Edrees
E-mail:ac_csd@arabcont.com
Quick Links
Latest News
September 19, 2018 |The AC Awarded the Contract of the Development of Uganda Road with a Value of 54 Million US$
Eng. Mohsen Salah  - AC Chairman & CEO declared that the Arab Contractors Company awarded the contract of the Modernization and Development of Masaka-Boukakata Road – South Uganda with a tot.... Read more
September 9, 2018 |President Abdel Fattah El Sisi Toured Al Jalala Touristic Resort
September 9, 2018 |President Abdel Fattah El Sisi Inaugurated the Middle Road in Sharm El Sheikh and Qous Cross Bridge in Qena
September 5, 2018 |The Minister of Youth and Sports Follow Up the Work Progress of the Bikes Stadium
Read All News