AC Logo
 
AC Worldwide
AC Worldwide
 
   
Construction Services
  Services
Skip Navigation LinksHome : Services : Concrete Manholes
Concrete Manholes

Production Capacity: 30 Manholes / Day

The Factory including the followings:

  • Batching plant 55m³/day for semi-dry concrete production
  • ouring machine for manholes and pipes
  • Metal moulds for manholes and pipes components, including a group of vibrators.

 The Advantages of the manhole production line:

  1. High production rates 15 manholes / night shift (8 hours)
  2. High quality surface finishing
  3. Manufacturing is according to the American standards and the Egyptian code.

Manholes Components:

  • A circular base slab 1200mm internal diameter and 900mm high
  • Risers with different height 1200, 900, 600, 300mm
  • Flat or conical covers upon client request.

Productions under study:

  • Moulds for circular manholes 80, 100, 150cm diameters on the production line.
  • Moulds for circular manholes 300cm diameters.
  • Moulds for square manholes 300cm diameters.
 
A Complete Manhole
First: The Base Slab  
The mould of the base slab Installing the base slab iron
The pouring of the base slab The final product of
 the base slab
Second: The Risers  
Riser Mould
Riser Final Product
Third: The Flat Cover
The Mould of the Flat Cover
The Final Product of the Flat Cover
Fourth: The Conical Cover
The Mould of the Conical Cover
The Final Product of the Conical Cover
Production Line


Related Information
Contact Information
Scaffolds & Specialized Works Dept.
Kilo 47, Cairo/Ismai
Tel.: 01273040066 - 01225511948 - 0128302360
Fax: 01229097862 - 01206980432
Dept. Manager : Eng. Abu Bakr Ahmed Kamel Edrees
E-mail:ac_csd@arabcont.com
Quick Links
Latest News
August 9, 2018 |Dr. Shawki Allam Attended the Farewell Ceremony for the Pilgrims from AC
Dr. Shawki Allam - the Mufti of the Republic, Eng. Emam Afify and Mr. Hossam Al-Din Imam - the Vice Chairman, and Dr. Onsi El Beshouty – the Board Member attended the farewell ceremony for the pilgri.... Read more
August 8, 2018 |Eng. Emam Afify and Mr. Hossam Imam Visited the Company Projects in Algeria
August 7, 2018 |Major Gen. Hassan Abdel Shafi and Eng. Mohsen Salah Following up the Work Progress in Al Fatah Al Aleem Mosque
July 31, 2018 |Eng. Mohsen Salah Attended the General Assembly of the Arab Contractors Cameroon Ltd
Read All News