AC Logo
 
AC Worldwide
AC Worldwide
 
   
Projects
Skip Navigation LinksHome : Projects : Domestic
projects
Water & Wastewater
Expansion of Mit Fares Water Station
Project DetailsDownloadsView Similar Projects

The scope of work: increasing the station capacity from 400 l/sec. to 1750 l/sec.
The project works including the followings:
1. Ground tank
2. 2 circular filters + a wheel for distribution
3. Clarifiers building
4. Chlorine building
5. Transformers building
6. Raw water intake
7. Raw water pumping station
8. Raw water pipeline: total length is 22km and 1200mm precast concrete pipes with steel cylinder.
9. a network of pipes with different diameters 50 km length
Project Value: EGP 230 million


Related Information
Projects
Quick Links
Worldwide Office Locations
SafetyFind our contact information. Read more »
Latest News
May 19, 2013 |Successful Work Tour in Equatorial Guinea
Dr. Ossama El Hosseiny returned from a successful tour to Equatorial Guinea. He visited the company headquarter in Malabo. Then, he headed the board meeting of the Arab Contractors Company in Equator.... Read more
May 19, 2013 |70 Million US$ New Projects to AC in Equatorial Guinea
May 19, 2013 |AC Celebrated the Golden Jubilee of the Organization of African Union
April 23, 2013 |Inauguration of Sidi Gaber Station with a Value EGP 225 Million
Read All News