The scope of work: increasing the station capacity from 400 l/sec. to 1750 l/sec.
The project works including the followings:
1. Ground tank
2. 2 circular filters + a wheel for distribution
3. Clarifiers building
4. Chlorine building
5. Transformers building
6. Raw water intake
7. Raw water pumping station
8. Raw water pipeline: total length is 22km and 1200mm precast concrete pipes with steel cylinder.
9. a network of pipes with different diameters 50 km length
Project Value: EGP 230 million
|