We consider that our greatest strength is the qualifications and expertise of our work force when linked together with a singular shared vision. It is a vision that puts our client’s needs first,...... Read More
The Arab Contractors Company's concept of excellence and distinction is based on the principle that the design, development, controlling, administration, service providing and work execution are according to the quality standards......Read More
We have a nationwide network of offices and powerful presence all over Egypt..... More
We have international offices & branches offer professional building services in Africa & Europe. ..... More
Latest News
May 19, 2013
The celebration of the 50th Anniversary of the Establishment of the Organization of African Unity/African Union (Golden Jubilee) at the Arab Contractors Sporting Club under the auspicious of Dr. Ossama El Hosseiny – Chairman of the AC, attended by the ambassadors and representatives of 20 Afr.... More
70 Million US$ New Projects to AC in Equatorial Guinea ....
Successful Work Tour in Equatorial Guinea....
April 23, 2013
Inauguration of Sidi Gaber Station with a Value EGP 225 Million....
If you feel that you are up to it, Join our team now. Our people change the world with a "can do" spirit with more than 50 years........Read More
Value: L.E.300 million The longest bridge in Egypt, 18.705 kilometers long and ranges from 14-34 meters wide. It has 23 inlet and outlet ramps with a width of 7-8 meters. The seven stages have been completed from Dokki to Ghamra, the 8th stage reaches the autostrad and all construction phases did not hinder Nile navigation in both of its branches. The latest technological methods were used in construction, some of them for the first time in Egypt, such as: - Caissons were pulled on shiplift to the Nile then floated and pulled to its specified places to erect piers under the bottom of the Nile. - The superstructure was constructed without any shutterings which hinder the traffic under it, specially over squares and railways crossings. It was constructed by cantilever carriage and launching truss systems. -Piers cloumns range from 9 to 22 meters high on foundations of precast piles (Vibro, Benito, Franky and Raymond), at depths ranging from 18 to 28 meters under the ground.