AC Logo
 
AC Worldwide
AC Worldwide
 
   
Machinery and Equipment
  About Us
Skip Navigation LinksHome : About Us : Resources : Machinary & Equipment
machinary and equipment

Part of Arab Contractors competitive advantage comes from adopting efficient equipment management system , which looks mainly for minimizing downtime. This successful system is based on :

  • Development in direction of add–on– reliable equipment , and purchasing the latest technology .

  • Short – list procurement policy of internationally recognized manufacturers. Economic replacement policy , which ensures operating fleet within its profitable life time.

  • Organization structure comprises a rental department to satisfy and fulfil projects unique needs and urgent cases , in order to avoid any delays.

  •  Mobile and stationary maintenance and repair workshops, besides imposition of operation and maintenance software covers all mechanical management levels.

  • Preserving equipment top performance through an overhauling plan carried out by three central overhauling workshops.

  •  Recruitment of competent operators and technicians. Continuous upgrading training program. Scrap the non-profitable equipment.

Related Information
Quick Links
Latest News
November 7, 2017 |Head of Military Engineers Department and Chairman of the Arab Contractors Company touring the Mosque of El Fattah El Aleem in the New Administrative Capital
Brigade General Hassan Abdel Shafy – Head of Military Engineers Department and Eng. Mohsen Salah –CEO & President of th.... Read more
November 5, 2017 |Minister of Transport and Head of the Engineering Authority for the Armed Forces Touring Rod El Farg Axis
November 2, 2017 |AC Chairman Touring the Project of El Galala Resort
August 13, 2017 |Eng. Mahlab Touring El Nahda Tunnel in Giza
Read All News
Total Equipment Cost 4409  L.E. Million