AC Logo
 
AC Worldwide
AC Worldwide
 
   
News
  News
Skip Navigation LinksHome : News Archive : News Details
News Archives
  • News  2018
  • News  2017
  • News  2016
  • News  2015
  • News  2014
  • News  2013
  • News  2012
  • News  2011
  • News  2010
  • News  2009
  • News  2008
  • News  2007
  • News  2006
  • News 2017
    Minister of Transport and Head of the Engineering Authority for the Armed Forces Touring Rod El Farg Axis
    November 5, 2017
    Click here to view more photos >>
    Dr. Hisham Arafat – Minister of Transport and Major General Kamel El Wazeer – Head of the Engineering Authority for the Armed Forces toured Rod El Farg Axis which is considered one of the mega projects of the National Network for Roads to transfer the traffic from East Cairo to Alex Desert Road, Matrouh and El Alameen without crossing Cairo Governorate. 
    It is noteworthy that the 2nd phase of Rod el Farg Axis is 12km length on both sides, including 6 sectors; one of them is the Nile Western Bridge: 400m length over the River Nile, 14m height, 55m width, it consists of two ways and 5 lanes on both sides. Whereas the Nile Easter Bridge is 540m, it consists of two main pillars, about 100 meters from the surface of the water for the installation of huge cables weighing up to a thousand tons approximately to bear the body of the bridge. It is connecting between Gezert El Warraq and Shoubra District. It is considered the widest Cable Stayed Bridge worldwide, its width from the center is 64m, and its width in Shoubra is 84m with a total capacity 12tons. Thus, there are 4000 engineers, technicians and workers participating in this huge project working for 24hours; in addition to huge number of equipment: 19 cranes with varied capacity reached 300 tons, 15 loaders, 18 pilling machines and 2 ferryboats were specially manufactured for the sake of the project in the Arab Contractors Workshops in El Maasara with a total cost 46million EGP in addition to ferryboats, motor launch and other maritime halls.

    Related Information
    Latest News
    September 9, 2018 |President Abdel Fattah El Sisi Inaugurated the Middle Road in Sharm El Sheikh and Qous Cross Bridge in Qena
    H.H. President Abdel Fattah El Sisi inaugurated through the video conference the Middle Road "Ibn Sina" in Sharm El Sheikh and Qous Cross Bridge in Qena  which executed by the Arab Con.... Read more
    September 9, 2018 |President Abdel Fattah El Sisi Toured Al Jalala Touristic Resort
    September 5, 2018 |The Minister of Youth and Sports Follow Up the Work Progress of the Bikes Stadium
    September 3, 2018 |AC Chairman Following up the Finishing Works of Al Jalala Touristic Resort
    Worldwide Office Locations
    Worldwide Office Locations Find our contact information. Read more »
    Quick Links